The Forward Entry Building: A two level space consisting of a check point desk, twin computer monitoring stations arranged in 24' tall towers on the left and right of the check point desk, and a conference area on the second level.
Connection Bridge: A hardened structure spanning a 100' wide canyon. Both ends of the bridge consist of a fully enclosed tunnel like structure, designed to trap unauthorized personal within the passageway by sealing off 2 sets of heavy doors with bullet resistant armored glass
Rear Building, Main Ops: This section of the project is still under construction, and should be completed within the next several weeks. The rear structure consists of 3 levels - surveillance and common use on the first floor, private offices on the 2nd floor, and conference on the third. The rear of the building is a triple hieght space with monitoring and surveillance towers.
What follows are images of the front building and bridge, with an exterior shot of the rear building. Comments are always welcome.
Entrance Area
Entry Doors
Computer Tower
Second Level - Conference